Draft Amendment C153surf and draft permits PA 2604642, PA 2604639 and PA 2604643.
Find answers about the proposed neighbourhood, its environmental setting and how the planning process works. The plans and controls are proposed and remain subject to approval.
← Back to the project overview45 questions in five topics
Topic 1 of 5
About the proposal
Why is residential development proposed at Messmate Road?
Messmate Road has been identified for Torquay’s future urban growth through successive strategic-planning processes for many years. Draft Amendment C153surf seeks to establish the detailed planning, infrastructure, environmental and landscape framework for that planned growth within the existing protected settlement boundary. The current proposal remains subject to consultation and a decision.
Read more: Council planning library and Messmate Road planning information.
Link to this answerIs Messmate Road a newly identified growth area?
No. Messmate Road is not a newly identified growth area arising from the current landowner proposal. It featured in the Torquay–Jan Juc Structure Plan in 2007 and Council’s Sustainable Futures Plan Torquay–Jan Juc 2040, adopted in 2014. The Surf Coast Statement of Planning Policy (2022) identifies the Messmate Road future urban area, and more recent Council planning has continued to plan for future residential development here.
Read more: Council’s adopted strategic-planning documents.
Link to this answerDoes Council support residential growth at Messmate Road?
Council’s longstanding strategic planning identifies Messmate Road for future urban and residential growth. Its Sustainable Futures Plan, Urban Futures Strategy and Messmate Road concept planning provide that strategic context.
That is different from endorsing every element of Draft Amendment C153surf, the proposed Development Plan or the associated draft permits. The detailed proposal remains subject to consultation and consideration through the current planning process. The Minister for Planning is the planning authority for C153surf.
Read more: Council’s Messmate Road information and the official consultation.
Link to this answerIs the proposal expanding Torquay beyond the protected settlement boundary?
No. The proposal does not move or extend Torquay's protected settlement boundary. The amendment applies to land within the existing boundary. It also proposes specific landscape and built-form controls for the sensitive transition between the future neighbourhood and the Thompson Creek Valley. The proposed Significant Landscape Overlay identifies the ridgeline forming the protected settlement boundary as an important visual boundary that contributes to Torquay's identity as a contained coastal township.
Source: Proposed SLO12 and October 2026 Explanatory Report.
Link to this answerWhat is proposed?
The wider amendment proposes a planning framework incorporating: a range of housing types, lot sizes and densities; affordable and medium-density housing; a neighbourhood activity centre; local parks and a recreation reserve; walking and cycling connections; new and upgraded roads; drainage and integrated water-management infrastructure; landscape and biodiversity protections; community infrastructure; and development-contribution and shared-infrastructure arrangements. The precise design and delivery of individual elements would continue through subdivision, engineering, permit and infrastructure-approval processes.
Source: October 2026 Explanatory Report.
Link to this answerWhat kind of neighbourhood is intended?
The proposed Development Plan seeks a liveable, walkable and sustainable neighbourhood with different housing choices, landscaped streets, open space, active-transport connections and access to local services. It also responds to the site's landscape and environmental setting, including the protected settlement boundary, Karaaf Wetlands, Deep Creek and Grasstree Park Nature Reserve.
Source: October 2026 Explanatory Report and proposed Development Plan.
Link to this answerHow many homes are proposed?
The three draft planning permits propose 746 lots at 50 Messmate Road, 195 lots at 120 Messmate Road, and 248 lots at 1350 Surf Coast Highway and 40 Messmate Road - 1,189 lots across the three current permit applications. The Explanatory Report estimates the completed Messmate North Precinct could accommodate approximately 1,350 homes when medium-density sites are included.
Source: October 2026 Explanatory Report.
Link to this answerWhat approvals are being sought?
Draft Amendment C153surf seeks changes to the Surf Coast Planning Scheme to establish a planning framework across the wider Messmate Future Urban Area. It proposes residential rezoning for northern Stage 1, development and landscape controls, and infrastructure-contribution mechanisms. The proposed North Development Plan and three draft permit applications address northern subdivision and associated works: PA 2604642 for 50 Messmate Road, PA 2604639 for 120 Messmate Road, and PA 2604643 for 1350 Surf Coast Highway and 40 Messmate Road. Southern and later stages would be progressed separately by other parties and would need their own approvals.
The Minister has not yet made a decision. The amendment, controls, Development Plan and draft permits remain under consideration. Water-management compliance, road connections, park layouts, vegetation and wildlife management, infrastructure staging and affordable-housing delivery remain subject to further assessment, detailed design and approvals as applicable. Consultation may lead to changes. Publication of the proposal does not indicate endorsement or approval by the Minister or Council.
Source: October 2026 Explanatory Report.
Link to this answerHas the community previously been consulted about growth in Torquay?
Previous Surf Coast engagement and strategic-planning processes have identified community priorities including environmental protection, controlled growth, housing choice, infrastructure, open space, climate resilience and transparent decision-making. Consultation on Draft Amendment C153surf provides the community with an opportunity to consider and respond to the specific planning controls, Development Plan and permit applications now proposed.
Source: Community Engagement Report and current exhibition framework.
Link to this answerIs everything already decided?
No. The exhibition package presents a detailed proposal for consideration by the community, government agencies and the relevant decision-maker. Submissions will be considered through the amendment process before a final decision is made.
Source: October 2026 Explanatory Report.
Link to this answerTopic 2 of 5
Karaaf Wetlands, water and environment
Why are the Karaaf Wetlands important?
They form part of a sensitive wetland and saltmarsh environment. The amendment's integrated water-management response has been developed to protect the environmental values of Karaaf, Deep Creek and Grasstree Park Nature Reserve.
Source: Draft DPO15 and October 2026 Explanatory Report.
Link to this answerWill stormwater from new development enter the Karaaf Wetlands?
The proposed controls include a requirement to prevent urban stormwater entering the Karaaf Wetlands. If approved, compliance would need to be demonstrated through subsequent approvals and detailed design. The proposed controls would also require protection of Deep Creek’s geomorphic integrity and function and an appropriate environmental water flow to Grasstree Park Nature Reserve. An Integrated Water Management Plan would need to demonstrate how these outcomes could be achieved, including drainage design, harvesting, reuse and delivery arrangements. These matters remain subject to assessment and approval.
Read more: Proposed DPO15 and draft permit integrated water-management requirements.
Link to this answerHow will that outcome be secured?
If approved, the proposed controls would require an endorsed Integrated Water Management Plan (IWMP) addressing prevention of urban stormwater entering Karaaf, protection of Deep Creek’s physical form and function, appropriate environmental water flow to Grasstree Park, stormwater-volume reduction, harvesting and reuse, drainage-reserve dimensions, governance and long-term responsibilities. Detailed design and subsequent approvals would need to demonstrate compliance; these proposed requirements do not establish that the outcomes have already been accepted or achieved.
Source: Draft DPO15.
Link to this answerIf stormwater does not enter Karaaf, where will it go?
The amendment proposes to redirect developed stormwater away from the Karaaf catchment towards the Deep Creek catchment. Before residual flows leave the development area, the proposed response includes measures to treat, retain, harvest and reuse stormwater and reduce the volume discharged downstream.
Source: October 2026 Explanatory Report and draft DPO15.
Link to this answerDoes redirecting water transfer the environmental problem to Deep Creek?
The proposed controls would require the IWMP to demonstrate how Deep Creek’s geomorphic integrity and function could be protected, together with stormwater-volume reduction and harvesting and reuse arrangements. The detailed response and its effects on the receiving waterway remain subject to assessment and approval; redirecting flows is not, by itself, evidence that environmental impacts have been resolved.
Source: Draft DPO15.
Link to this answerHow will Grasstree Park Nature Reserve be protected?
Under the proposed controls, the Integrated Water Management Plan (IWMP) would need to demonstrate how an appropriate environmental water flow to Grasstree Park Nature Reserve would be achieved. Compliance would be assessed through detailed design and subsequent approvals. The broader framework also seeks to protect the reserve's ecological qualities and establish ecological connections between the reserve and surrounding rural land.
Source: Draft DPO15 and October 2026 Explanatory Report.
Link to this answerWill stormwater be harvested and reused?
Yes. Harvesting and reuse form part of the proposed integrated water-management response. If approved, the proposed controls would require harvesting arrangements to address governance, delivery mechanisms and long-term responsibilities. The Explanatory Report identifies potential reuse on greenspace within the precinct and, following treatment, for irrigation of nearby agricultural land.
Source: Draft DPO15 and October 2026 Explanatory Report.
Link to this answerHow will major storm events be managed?
Detailed engineering plans would be required as individual stages are developed. The draft permit framework would require functional layout plans to address major drainage infrastructure, overland flow paths for major storm events, ultimate outfalls and the design of relevant wetlands or retarding basins, operating consistently with the endorsed IWMP and applicable drainage requirements.
Source: Draft permit conditions. Detailed asset configurations may vary between permit areas.
Link to this answerWhat happens to native vegetation and habitat?
Some native vegetation and canopy-tree removal is proposed; not every existing tree would be retained. The biodiversity and arborist assessments identify vegetation values and trees for retention. Proposed controls and permit conditions address approved removals, tree protection during works, native vegetation offsets and new planting. Grasstree Park remains a conservation reserve.
Read more: Biodiversity Assessment, Arborist Report and draft planning permit conditions.
Link to this answerHow will kangaroos and wildlife be managed during development?
Under the proposed controls, a suitably qualified ecologist would need to prepare a Kangaroo Management Plan before subdivision certification, with implementation secured through the approval requirements. It would assess kangaroo populations within the development area and at least one kilometre beyond it, movement corridors, risks of animals becoming landlocked, refuge areas, development staging, animal welfare and public safety.
Read more: Proposed DPO15 — Kangaroo Management Plan.
Link to this answerTopic 3 of 5
Landscape, traffic and infrastructure
How does the proposal protect the ridgeline?
The proposed Significant Landscape Overlay recognises the ridgeline forming the protected settlement boundary as an important landscape feature. Its objectives seek to keep high points and ridgelines vegetated and free from development and infrastructure, protect views to the natural form of the landscape, prevent buildings and infrastructure from visually dominating the skyline, maintain a generous urban-rural transition, and use setbacks, building controls and indigenous vegetation to keep development subordinate to the landscape.
Source: Proposed SLO12.
Link to this answerHow will the visual impact of development be managed?
The proposed SLO would require future permit applications to assess relevant views from the Thompson Creek Valley and provide plans, sections, elevations and sightline analysis. The landscape response also includes a landscaped ridgeline linear park, canopy planting and controls on building height, setbacks, colours and landscaping near the protected settlement boundary.
Source: Proposed SLO12 and October 2026 Explanatory Report.
Link to this answerHow will the urban-rural transition be managed?
The proposed controls seek a generous transition that minimises the visibility of development from surrounding rural land. Within the proposed landscape-overlay area, requirements address building height, front setbacks, subdued colours and indigenous tree planting. DPO15 also proposes restrictions for lots adjacent to, or within 30 metres of, the protected settlement boundary.
Source: Proposed SLO12 and DPO15.
Link to this answerWill new housing create more traffic?
Yes, new housing would generate additional vehicle trips. The exhibited Traffic and Transport Review assesses the proposed road network and future traffic conditions. The amendment proposes an interconnected road system, connections to the surrounding arterial network, active-transport infrastructure and provision for potential future bus services.
Source: October 2026 Traffic and Transport Review and Explanatory Report.
Link to this answerWill surrounding roads be upgraded?
The proposal includes changes to the transport network to support the new precinct: a new local-road network and upgrades to connections with surrounding roads. Detailed road designs, intersection treatments, construction timing and traffic-management arrangements would be resolved through the relevant subdivision and engineering approvals.
Source: Current traffic report, Explanatory Report and relevant permit conditions. Specific works vary by permit area.
Link to this answerWill walking and cycling infrastructure be provided?
The proposed Development Plan contains an integrated walking and cycling network, including shared paths, green streets, ecological links and connections between housing, parks and neighbourhood destinations. The Explanatory Report also identifies a walking and cycling trail through the proposed ridgeline linear park.
Source: October 2026 Explanatory Report and proposed Development Plan.
Link to this answerHow will infrastructure delivery be coordinated with development?
Delivery is proposed to be coordinated with staged development. The shared-infrastructure framework addresses contributions, works-in-kind, credits and reimbursement arrangements. Permit-level infrastructure plans would then identify land required for infrastructure, public open space and the staging of works within each development area.
Source: Draft DPO15, DCP/SIFP and permit-level implementation.
Link to this answerHow will infrastructure be funded?
Two complementary mechanisms: the Messmate Development Contributions Plan and the Messmate North Shared Infrastructure Funding Plan. The proposed DPO15 would require applicable permits to secure shared-infrastructure arrangements through a section 173 agreement, including levies, works-in-kind, credits and reimbursement for over-provision. Funding arrangements differ by asset. This answer should not be interpreted as saying every item will be funded through one mechanism or that there will be no service-authority costs or customer contributions.
Source: October 2026 Explanatory Report, draft DPO15, DCP and SIFP.
Link to this answerHow would parking be provided?
Parking forms part of the proposed street network and future housing design. The Traffic Report includes on-street parking in relevant local streets, with arrangements varying by street type. Detailed designs would need to address access, pedestrian and cycling connections, landscaping and road safety. Parking for future homes would be assessed against the applicable planning requirements.
Source: Traffic Report — proposed street hierarchy and cross-sections.
Link to this answerTopic 4 of 5
Housing, neighbourhood and open space
What type of housing is proposed?
A range of lot sizes, dwelling types and densities. The Explanatory Report identifies an overall density generally between 17 and 22 dwellings per net developable hectare, with higher-density and affordable housing encouraged in well-located areas, including near the proposed neighbourhood activity centre.
Source: October 2026 Explanatory Report.
Link to this answerIs this a high-density development?
The precinct is proposed to contain a range of housing densities rather than one density throughout. Smaller and medium-density housing would be focused near services, open space and movement connections. Lower built form and additional landscape controls are proposed near the protected settlement boundary.
Source: Explanatory Report, Development Plan, SLO12 and DPO15.
Link to this answerWill affordable housing be provided?
If approved, the proposed planning framework would require an affordable-housing contribution. An Affordable Housing Delivery Strategy would set out how it is delivered, including the housing mix, location, ownership and management arrangements, affordability and timing. The proposed controls and individual draft permits set out the relevant requirements.
Read more: Proposed DPO15 and draft planning permits.
Link to this answerHow will Torquay's character be considered?
The proposed controls seek to reflect Torquay's coastal and landscape setting through open space, landscaping, street design, housing guidance and specific treatment of the protected settlement boundary. Housing Design Guidelines would be required before certification of the first relevant plan of subdivision and would need to be generally consistent with the preferred future character in the Development Plan.
Source: Draft DPO15, SLO12 and permit conditions.
Link to this answerHow do green streets connect parks and habitat?
The proposed landscape network centres on a continuous ecological corridor along the ridgeline. Integrated paths and green streets are intended to extend connections from this landscape spine into the neighbourhood.
Within selected streets, generous nature-strip planting, groundcover and tree canopy are intended to strengthen habitat connections between the ridgeline, wetland landscapes and local parks. Shared paths are proposed to connect these green spaces with homes and everyday destinations.
The network proposes connections along the Grasstree Park interface and towards the future employment area and local centre, seeking to link the neighbourhood into the wider precinct. Green streets combine their landscape and ecological role with walking, cycling and local access.
Green streets are distinct from dedicated conservation reserves. Detailed planting, crossings and habitat outcomes remain subject to design and approval. Kangaroo movement and welfare would need to be addressed through the proposed Kangaroo Management Plan.
Read more: Ecological Links Plan — Spiire North Development Plan and North Development Plan — Part A.
Link to this answerWhat open space is proposed?
Local parks; a new recreation reserve; shared paths; green streets; ecological links; landscaped drainage areas; and a ridgeline linear park. Precise design, staging and delivery would be addressed through the Development Plan, contributions framework and permit-level Public Infrastructure Plans.
Source: Explanatory Report, Development Plan and infrastructure framework.
Link to this answerWill residents rely on Grasstree Park for open space?
The precinct proposes its own open-space and recreation network. Grasstree Park is a conservation reserve and would continue to be treated as an environmentally sensitive neighbour, with separate water-management and ecological requirements to protect its values.
Source: Explanatory Report, Development Plan and DPO15.
Link to this answerWill the development contribute to new community facilities?
Yes. Development in the Northern Precinct would contribute funding towards new community and sporting facilities for the wider Messmate growth area. The Community Infrastructure Assessment considered existing services and the needs of the future population, and recommended contributions towards:
- A new active open space reserve: approximately 5.3 hectares, with sports fields and a pavilion.
- A multipurpose community centre: a neighbourhood-level facility, described as a Level 1 centre, with around 850m² of floor space for services such as kindergarten programs, maternal and child health, and community meeting spaces.
These facilities are planned within the Southern Precinct to serve the broader growth area. Northern development would help fund them through the development-contributions framework. They would complement the local parks, paths and open spaces proposed within Messmate North.
Delivery would be staged to respond to future growth and demand. Final designs, the mix of services and delivery timing would be resolved through the relevant planning and infrastructure processes.
Read more: Community Infrastructure Assessment — ASR Research and North Development Plan — community infrastructure.
Link to this answerWill the neighbourhood include tree canopy and shade?
The proposed DPO15 would require the Development Plan to demonstrate how a minimum 30% tree canopy cover within streetscapes and public open space, excluding wetlands and active recreation reserves, could be achieved. It would also require indicative tree-planting locations on public land. Detailed landscape designs would remain subject to approval, and new canopy planting is separate from retaining existing trees.
Source: Draft DPO15.
Link to this answerTopic 5 of 5
Safety, approvals and what happens next
How will bushfire risk be managed?
Proposed measures include setbacks between future buildings and hazardous vegetation, low-threat areas, perimeter roads, access and egress arrangements and applicable building controls. The current Bushfire Assessment concludes the proposed development can provide for BAL-12.5 or lower construction where its identified mitigation measures are implemented. Permit conditions would require relevant subdivision restrictions to implement the bushfire setbacks identified in the Bushfire Development Report. Exact setback distances depend on vegetation type, slope and location and should not be reduced to one precinct-wide number.
Source: Current Bushfire Assessment and permit implementation framework.
Link to this answerHas the land been tested for contamination, including dieldrin?
Environmental assessments have been completed for all sites in Messmate North. They consider historical land uses and potential contamination, including agricultural chemicals such as dieldrin. The three completed Preliminary Risk Screen Assessments report that dieldrin was not detected above relevant human health and ecological criteria in the samples analysed. Any further site-specific assessment, audit or management measures identified through the planning process would need to be addressed before relevant development could proceed.
Environmental investigations and Preliminary Risk Screen Assessments (PRSAs) are different stages of assessment. The consultation Explanatory Report records completed PRSAs for 120 Messmate Road, 40 Messmate Road and 1350 Surf Coast Highway, with a PRSA for 50 Messmate Road under preparation. Findings apply to the locations and land uses assessed; they do not establish that every part of the precinct is free of dieldrin. Poultry keeping and consumption of eggs produced on site were not assessed uses under the completed PRSAs.
Read more: Consultation Explanatory Report — environmental investigations and poultry restriction.
Link to this answerIs there potentially contaminated land within the precinct?
Environmental assessments have been completed for all sites, investigating potential contamination associated with historic land uses. The exhibited Explanatory Report proposes a Preliminary Risk Screen Assessment pathway for all land before development. Any findings would need to be implemented and, where required, an environmental audit would undertake further investigation before sensitive development proceeds. It also states an Environmental Audit Overlay is proposed over part of 1350 Surf Coast Highway. Assessment requirements and outcomes vary by property. This answer does not imply that all land is contaminated or that every parcel requires remediation or a full environmental audit.
Source: October 2026 Explanatory Report and applicable permit conditions.
Link to this answerDoes rezoning mean construction can begin immediately?
No. Development also depends on the relevant Development Plan and planning-permit approvals, subdivision certification, detailed engineering, service-authority requirements and delivery of stage-specific infrastructure.
Source: Current amendment and permit framework.
Link to this answerWho is the planning authority?
The current Explanatory Report states that the Minister for Planning is the planning authority for Draft Amendment C153surf.
Source: October 2026 Explanatory Report.
Link to this answerCan the proposal change following consultation?
Yes. Consultation allows matters to be raised and considered before a final decision, which may lead to changes to the proposed controls, Development Plan, permit conditions or infrastructure requirements. It does not mean every requested change will be made, but submissions form part of the statutory consideration.
Source: Current exhibition process.
Link to this answerHow can the community participate?
Read the consultation documents and make a submission through Engage Victoria by 13 November 2026. You can explain the issue that concerns you, the outcome you seek and any relevant local knowledge. The Department of Transport and Planning is consulting on behalf of the Minister for Planning before a decision is made. For questions about the amendment and consultation process, contact DTP’s Planning Facilitation branch at planning.facilitation@transport.vic.gov.au. Email enquiries do not lodge a formal submission.
Read more: Official Engage Victoria consultation.
Link to this answerAbout this information.
This website explains the landowner group’s proposal. Planning controls, permit conditions and delivery requirements remain subject to approval and can differ by property.